Saltar al contenido
SOTParaguachoa
The public instrument

The state of the territory, indicator by indicator

Eleven indicators of the archipelago, measured every 15 minutes. Each with its public threshold and the action that triggers if breached — and its certainty level in view.

Connecting with the source…O
…
Measurement: —

Containment rule: if one indicator turns red or three turn amber at once, the state escalates to the authority — the rule is public.

The 7 that define 2030

The nuclear indicators of the Green Corridor goal.

ElectricityGreen: >12 h/day · Alert: 6–12 h · Red: <6 hConectando…—
Umbral público

Outage >72 continuous h or >3 episodes of >4 h in 30 days (hormesis 0–72–120 h) · proxy [P]: national traffic drop ≥40% in 3 h (IODA)

Si se incumple

Certified hotels switch to their plant to keep light and refrigeration for 72 hours (hormetic threshold 0–72–120 h)

CertezaOFuente: Team report (editorial panel)
WaterGreen: Normal · Alert: Rationing · Red: OutageConectando…—
Umbral público

Interruption >12 h or pressure <20 PSI at a certified node

Si se incumple

Internal reserve systems and certified cisterns

CertezaOFuente: Team report (editorial panel)
ConnectivityGreen: <500 ms · Alert: 500 ms–2 s · Red: >2 sConectando…—
Umbral público

Speed <5 Mbps or latency >400 ms at the Edge node · signal: cron freshness >90 min or IODA drop ≥40% [P]

Si se incumple

ALMA and the Cacique automatically switch to 100% offline mode

CertezaOFuente: API freshness + IODA
RoadsGreen: Passable · Alert: Detour needed · Red: BlockedConectando…—
Umbral público

Road blockage >2 h on a main tourist route or a full-day detour

Si se incumple

The day’s routes are reassigned and road alerts are issued

CertezaOFuente: Team report (editorial panel)
Public safetyGreen: Normal · Alert: Alert · Red: RestrictionConectando…—
Umbral público

Type-N incident (violent robbery, tourist theft) within the Corridor perimeter in 7 days

Si se incumple

Immediate activation of the Conflict Containment Protocol (PCC)

CertezaOFuente: Team report (editorial panel)
WeatherGreen: Favorable · Alert: Caution · Red: AdverseConectando…—
Umbral público

Orange or higher weather alert (INAMEH) in the crossing zone · amber: rain/gusts ≥65 km/h

Si se incumple

Suspension of sea crossings to Cubagua and Coche; recalibration of beach carrying capacity

CertezaVFuente: Open-Meteo
Medical emergenciesGreen: Operational · Alert: Limited capacity · Red: SaturatedConectando…—
Umbral público

Pending medical evacuation >90 minutes since the alert

Si se incumple

Land or sea medical evacuation protocol to the Porlamar or La Asunción hubs

CertezaOFuente: Team report (editorial panel)

The 4 of the day to day

The visitor's daily operation.

FerryConectando…—
Umbral público

Route interrupted (editorial [O]) · crossing: significant wave ≥3 m in the channel [V] (rule ch. 10.3)

Si se incumple

Ticket rescheduling, alternate routes and notice to passengers in transit

CertezaEFuente: Open-Meteo Marine + team report
FlightsConectando…—
Umbral público

No schedule published today and no flights observed → no report. Alert only with ≥2 FIDS cancellations representing ≥20% of the program

Si se incumple

Notice to travelers with connections and re-accommodation with the airlines

CertezaEFuente: AeroDataBox (published schedules)
Regional earthquakesConectando…—
Umbral público

Alert: M≥4.5 in the regional box within 24 h · Red: M≥5.5 in box or M≥4.5 within <100 km of Porlamar (USGS)

Si se incumple

Infrastructure verification at Corridor nodes; cross-check with the national seismic report

CertezaVFuente: USGS
Sea stateConectando…—
Umbral público

Beaches/coast: significant wave ≥2.5 m → red · crossings: ≥3 m (see ferry indicator)

Si se incumple

Suspension of crossings and nautical activities in the affected area; beach itinerary recomposition

CertezaVFuente: Open-Meteo Marine

This page is the QR destination of the territory's certified nodes.

Whoever scans a Green Corridor node arrives here.